Manufacturing Case Study
Meridian Manufacturing: Operations Backbone Rebuild
−38% ops cost6-week delivery99.7% uptime
The Challenge
Legacy ERP system causing 40+ hours/week of manual data reconciliation across 6 production facilities.
The Solution
Replaced outdated sync logic with an event-driven database backbone and custom real-time facility monitoring dashboards.
"Lytnex rebuilt our entire operations backbone in 6 weeks. We eliminated 38% of our manual overhead on day one."
— Sarah Chen, VP OperationsSystem Verification Logs
Verification statusPassed
System load capacity10,000+ sessions/s
Performance metrics resultDeploy time: Real-time | Overhead: −38% | Uptime: 99.7%
Operations Verification:This system architecture was built, load checked, and verified under production SLAs.